Major progress today in the Jumbo Production Room. The lighting has been fully installed and switched on, illuminating the production floor for the first time. With the space now lit, the scale and layout of the room are becoming clear, bringing us one step closer to equipment placement.
Work has been ongoing around the clock, and at 2:00 a.m. the team reached the next milestone: electrical drops were installed at the locations designated for the packaging equipment. These drops will supply power to the production lines scheduled to be installed in the upcoming phase.
The space is quickly transitioning from construction to a production-ready environment.
November 6, 2025